Hays County is planning for a new alignment of RM 150 from Yarrington Road near I-35 northward to the existing RM 150 west of Arroyo Ranch. This project, initially proposed in 2014, aims to improve safety and reduce congestion along the current RM 150 route and downtown Kyle. Additionally, it seeks to strengthen the transportation network in this rapidly growing region.

 

PROJECT FEATURES

  • Construction of a two-lane undivided road, with plans for expansion into a four-lane divided road in the future from Yarrington Road near I-35 northward to the existing RM 150 west of Arroyo Ranch

  • 10-foot Shared Use Path on both sides of the roadway

  • Medians varying in width from 6 to 40 feet  

  • Intersections  

    • Signalized intersection at Blanco Vista Road

    • Roundabout intersections at Roland Lane

    • Overpass at Old Stagecoach Road

    • Overpass at 6 Creeks Boulevard 

    • Future intersection with Cypress Road planned by the City of Kyle​

RM 150_Typical Section-R2a_120' Proposed ROW.png

120‘ ROW Typical Section

RM 150_185' Proposed ROW-R1a.png

185‘ ROW Typical Section

NEXT STEPS

With the completion of the schematic design, Hays County is beginning the Plans, Specifications, and Estimates (PS&E) and right-of-way acquisition project phases.

  • PS&E is the detailed design phase necessary for moving toward construction. This phase includes additional survey work, refined design drawings, and specifications for materials and construction requirements.

  • Right-of-way acquisition involves negotiating with landowners to acquire the necessary rights to portions of their property required for the project. The new roadway alignment will require a right-of-way width ranging from 120 to 185 feet. The county and project team will collaborate closely with affected property owners throughout the acquisition process.

20250321-RM150Align-FinalSchematic-ProjectExhibit.png

TIMELINE​

RM150_Timeline-R1.png

FUNDING

This project is funded through the voter-approved 2024 Hays County Road Bond:

  • $10.8 M: Design and right-of-way acquisition from Yarrington at I-35 to Old Stagecoach Road (construction funding has not yet been identified)

  • $49.5 M: Design, right-of-way acquisition, and construction of the initial two-lane undivided road from Old Stagecoach Road to the Existing RM 150 near Arroyo Ranch Road

​

PUBLIC ENGAGEMENT

Hays County values the vital role that public engagement plays in the future of the region’s transportation network and is committed to working with property owners and the community through this process. As the design moves forward, the county will host additional public meetings, with the next one anticipated at the 30% design phase. For any questions or concerns, our team can be reached at 512-400-6107 or via email at info@improve150.com.

​

PROJECT BACKGROUND

The County first began studying the RM 150 roadway in 2014. The schematic design was developed through a comprehensive evaluation of environmental constraints, input from property owners in the area, public engagement sessions, and technical analyses. These analyses considered key factors such as traffic volumes, access requirements, sight distances, water quality, drainage needs, and other critical design criteria. The feasibility study, conducted from 2014 to 2024, included 6 public meetings and close coordination with property owners and stakeholders.

MATERIALS AND ARCHIVES

Virtual Public Meeting – June 1, 2020

​

Public Meeting – October 25, 2018

​

Public Meeting – August 2, 2018

​Public Meeting – April 14, 2015

​

Open House – September 23, 2014

​

Open House – April 8, 2014

SIGN UP FOR UPDATES

Which project(s) do you wish to receive updates for? Required

Success! You have subscribed to project updates.

CONTACT US

info@improve150.com

512-400-6107

  • Facebook
  • Twitter
  • YouTube

© 2022 improve150.com

bottom of page